A 100A to 200A service upgrade in Toronto costs $1,500 to $4,000 all-in, per RenoHouse; Foxwood Electric puts a basic upgrade at $2,000 to $5,000. Two fees are easy to miss: the ESA notification, minimum $88, and Toronto Hydro's disconnect and reconnect at about $678 in most cases.
This range rests on 4 independent sources, counted from the 13 priced lines below rather than from a list at the bottom of the page. Every figure was re-read in the page it is credited to. Where sources disagree, both numbers are shown and the disagreement is named in the row's condition; we do not average them and we do not widen a range to cover one.
100A to 200A service upgrade, typical all-in project
$1,500–$4,000
100A to 200A basic service upgrade (Foxwood Electric, Toronto)
$2,000–$5,000
Meter base replacement (if required)
$200–$500
60A to 200A upgrade (older fused service)
$2,000–$3,500
Fuse box to breaker panel conversion
$1,000–$1,500
200A to 400A upgrade (larger home)
$4,000–$8,000
Grounding upgrade
$100–$300
Smart electrical panel, installed (alternative to a 400A upgrade)
$3,000–$5,000
Not drawn: 5 lines, each the only figure on this page quoted in per panel (CAD), per permit (CAD), minimum fee (CAD); larger jobs cost more, per the ESA fee guide, per project (CAD), most cases and per sub-panel (CAD). With nothing else in the same unit there is no shared scale to draw them on. Every one of them is priced in full in the table below.
100A to 200A service upgrade, typical all-in project
All-in: RenoHouse states this includes the panel, installation, permit and ESA inspection. Their own by-upgrade-type table is narrower for a straightforward job, at $1,500-$3,000, so the top of this range assumes complications.
100A to 200A basic service upgrade (Foxwood Electric, Toronto)
For a basic upgrade. Foxwood states the cost rises significantly for a higher amperage such as 400 or 600 amps, and that it moves with the type of service, the complexity of the installation and how much electrical work is needed.
New 200A breaker panel, equipment only
Equipment only. RenoHouse prices the 4-8 hours of labour separately at $600-$1,500, so this is well under half the job.
Meter base replacement (if required)
"if required" - not every upgrade needs one. RenoHouse notes a new meter base is a Toronto Hydro requirement on some service upgrades.
City of Toronto electrical permit
Varies with scope. RenoHouse states the electrician normally files it, though a homeowner may file their own, and that the ESA inspection fee is separate at $100-$200.
ESA residential notification of inspection, minimum fee
A MINIMUM, not a price. The ESA states fees vary with the type of work done, and that the fee is payable when the notification of work is submitted rather than after the inspection.
Toronto Hydro disconnect/reconnect fee
"in most cases" - the electrician's own wording, so it is not universal. It is charged on top of the panel work, and RenoHouse's separate breakdown puts utility disconnect/reconnect much lower at $0-$200 depending on the utility.
60A to 200A upgrade (older fused service)
A whole-service replacement from an older 60A fused supply, not a panel swap. RenoHouse prices a straightforward 100A to 200A job lower, at $1,500-$3,000.
Fuse box to breaker panel conversion
"typically", and for a SIMPLE replacement. The same electrician says a 100A to 200A upgrade that involves new service runs $3,000 or more, and that extra work such as moving the panel or a second meter can easily double the total.
Sub-panel addition (60A to 100A)
An addition to an existing service, not an upgrade of it. RenoHouse notes basement apartments typically need a separate 60A or 100A sub-panel.
200A to 400A upgrade (larger home)
RenoHouse ties this band to large homes running an EV charger plus a heat pump, and recommends 200A as the right size for almost every Toronto home instead.
Grounding upgrade
A line item inside the panel-upgrade breakdown, not a standalone job. RenoHouse notes older homes may need new grounding rods or water pipe bonding.
Smart electrical panel, installed (alternative to a 400A upgrade)
Panel plus installation. RenoHouse's case for it is load management rather than capacity: shedding non-critical loads at peak, prioritising EV charging off-peak, and letting a 200A panel handle 250-300A worth of equipment.
Two quotes for the same job are hard to compare when one folds a line into its total and the other leaves it out. This is the shape of the work, stage by stage, with every figure taken from the same priced lines in the table above.
A panel quote is two different things added together. The scope is competitive and the fees are not, so a quote that looks high may simply be the one that told you about the utility charge.
100A to 200A service upgrade
$1,500–$4,000
The common case. A second Toronto electrician on this page publishes a higher band for the same job, and both are in the table.
60A to 200A, older fused service
$2,000–$3,500
For an older fused service rather than a breaker panel.
Fuse box to breaker panel
$1,000–$1,500
A conversion rather than a service increase, and the cheapest of these.
200A to 400A, larger home
$4,000–$8,000
The large-home case. A smart panel is listed on this page as the alternative to going to 400A.
Sub-panel addition
$800–$2,000
Relevant here because a generator transfer switch is one of the reasons a second panel gets added.
Meter base replacement
$200–$500
Only where the service entrance needs replacing too, not just the panel.
Grounding upgrade
$100–$300
Priced separately from the panel itself.
City of Toronto electrical permit
$100–$250
A municipal fee, not a contractor's margin.
ESA notification of inspection
$88
This is the minimum. Larger jobs cost more, per the ESA fee guide.
Toronto Hydro disconnect and reconnect
$678
A fixed utility charge independent of the electrician's quote, and the single largest thing a quote can leave out without being wrong.
Size, access and how much of the existing electrical and gas work has to be redone move a electrical panel upgrade quote more than brand choice does. Each factor below is one a source on this page prices or names.
Ontario adds 13 percent HST, requires an ESA permit for the electrical work and a TSSA permit for anything gas-fired, and licenses who may do each. These are the local rules that change the total.
The biggest savings come from bundling visits, avoiding after-hours rates, and checking which fees a quote already contains. Each tip below is tied to a figure in the table above.
Every price on this page was found in the page it is credited to, and recorded with the sentence that carries it. Where a figure could not be found in its source it was removed rather than adjusted. Here is what that left, and what it could not settle.
Home Generator Index tracks 97 electrical panel upgrade contractors across the Greater Toronto Area, rated 4.87★ on average. The three below rank highest on our review-weighted score, based on Home Generator Index's analysis of 97 GTA businesses, August 2026.
Electricians
87/100 Home Generator Index Score
Says on its own site it does backup power work
Electricians
87/100 Home Generator Index Score
Electricians
87/100 Home Generator Index Score
Says on its own site it does backup power work
The table above is what other people paid. These calculators put your own house into the same published figures, and none of them asks for an email address.
What size generator do I need?
Tick your appliances. A furnace, fridge, sump pump and lights come to about 5,900 W and fit a 10 kW unit; add a 3-ton air conditioner and the same house needs 26 kW.
Open the toolWhat does a home generator cost?
A 14-18 kW standby generator is $9,500 to $13,000 fully installed in Toronto. Add a 100 A panel or a gas run past 60 ft and watch what it does to the total.
Open the toolTwo electrical panel upgrade quotes are hard to compare when each uses the same word for a different scope. These 3 terms appear on the line items above, and each one changes what a number covers.
an Electrical Panel Upgrade is rarely quoted on its own. A cost that looks like an overrun on a electrical panel upgrade quote is usually a priced line item on one of these three guides.
A 14-18 kW standby generator runs $9,500 to $13,000 fully installed in Toronto.
Read the cost guideLicensed electricians bill $80 to $150 an hour, with a $150 to $300 service-call minimum.
Read the cost guideAutomatic transfer switches run $1,500 to $3,000 installed; manual switches are $800 to $1,500.
Read the cost guide